HomeSelected Projects & Solutions
Applied and documented experience

Selected Projects & Solutions

Concise examples of the challenges and solutions handled by the team, while withholding client names and sensitive site details.

511 projects and solutions
Client and site privacy

Examples are presented in a general form. Client names, addresses, faces, vehicle plates and network details are not published without appropriate permission.

Applied experience & selected solutions

This section combines the team's applied field experience with solutions developed or operated by 511. We keep wording general so a specific client project or integration is not attributed to 511 unless its delivery status is documented and suitable for public use.

Educational facility

Integrated CCTV and access-control linkage

Challenge: Cover entrances, open areas and critical points while making event review easier.

Solution: CCTV design with recording, management, permissions and access-event linkage where supported.

Outcome: Clearer visibility and event records that support management and security teams.

Vehicle management

Plate monitoring and unauthorized-vehicle alerts

Challenge: Organize vehicle entry and provide searchable records.

Solution: ANPR cameras, allow lists, alerts and gate integration based on site permissions.

Outcome: Less manual checking and clearer entry and exit visibility.

Internal operations

Key, parking and lost-and-found management systems

Challenge: Paper records and limited visibility of current responsibility and status.

Solution: Digital tools for search, logging, permissions, reports and activity history.

Outcome: Faster information, clearer accountability and less duplication.

Institutional workplace

Corporate email, cloud services and organized collaboration

Challenge: Dispersed email, files and account management.

Solution: Domain, email, storage, permissions and usage-policy configuration.

Outcome: A more professional identity, structured collaboration and clearer account control.

Software & platforms

Digital products and active projects

Alongside field engineering, 511 has a real software-development track. Statuses are stated without mixing “delivered” with “under testing”.

Deployed

511 website and administration / ERP portal

The corporate web and internal ERP platform used in practice for catalogue, products, orders, order status, inventory, users, permissions and digital services.

Available on Google Play

BASIRA

An Android assistive-AI product now available on Google Play, with Local/Cloud architecture, voice and privacy, plus a roadmap toward navigation and spatial intelligence. Download ↗

Advanced testing

Rafiqni

Passenger / Captain / Admin applications with Firebase, Google Maps and trip/request workflows in staged testing and release preparation.

Prototype

Rafiqni Taxi

A licensed taxi-office platform for drivers, vehicles, requests, official-meter fares, complaints and lost items; it remains in phased development.

Google Play Production

Key Manager 511

Institutional key, room, asset, user, movement-history and reporting management; the documented production release is 1.6.0 (45).

Internal testing

Itqan

An Android school learning assistant with lessons, exercises, tests, mathematical display and text-to-speech under continued content expansion.

Operational pilots

Frozen Store & Warehouse Manager

Frozen Store runs on Windows with validated Supabase synchronization, while Warehouse Manager covers main/sub-warehouse supply, transfers, issue, returns and reporting as a Windows pilot.

What is documented in each project?

Documentation makes maintenance and future expansion faster and less dependent on individual memory.

Layouts and locations

Points, paths, devices and addressing are recorded.

Settings and tests

Configuration and commissioning results are documented.

Permissions and training

Access responsibilities are defined and users are trained.

Maintenance and follow-up

A plan supports inspection, support and post-handover improvement.

Turn your facility requirement into a delivery plan

Share the approximate site, objective and existing systems to begin assessment.